Repair or Replace : Interpreting Diagnostic Test Results to Decide Whether to Repair, Replace or Monitor Your Electrical Assets

The proven method leading utilities and asset managers are now using to build their own Health Index and Risk Index — independently, transparently, and based on globally recognized international best practice (CIGRE TB 912)

Overview

This 2-day masterclass is designed for engineers and asset professionals working with MV and HV electrical assets who already perform or commission diagnostic testing and now need a clear, structured method to turn test results into confident asset decisions. The program focuses on helping participants decide whether to repair, replace, or monitor electrical assets such as cables, switchgear, transformers, motors, and generators.

The course introduces a practical FM/HI/RI framework based on CIGRE TB 912, enabling participants to interpret diagnostic evidence, identify failure mechanisms, build Health Index scores, assess Risk Index, and develop defensible recommendations for management.

Participants will work with real diagnostic reports from actual projects and apply the framework to real asset cases, including network PD analysis for cables and switchgear, cable offline assessment using VLF Tan Delta, 24kV air insulated switchgear, 11kV dry type transformer, and rotating machines using continuous and spot PD monitoring.

By the end of the program, participants will be able to combine multiple online and offline diagnostic results into one clear engineering conclusion, assess data quality and confidence, prioritize assets by risk, and construct repair or replace recommendations that are technically sound and management-ready.

Designed For

  • Electrical and reliability engineers working with MV/HV assets.
  • Engineers who handle PD testing or diagnostic reports.
  • Asset managers who need to decide which assets to repair, replace, or monitor.
  • Maintenance and condition monitoring teams.
  • Engineers who want to understand and build their own Health Index and Risk Index.
  • Project teams reviewing asset risks and repair options.
  •  Teams who engage third-party testing contractors and need to assess, validate and challenge their reports
  • Professionals managing cables, switchgear, transformers, motors or generators across power, utilities, oil & gas and industrial facilities

You will Learn

  • Interpreting PD and diagnostic results beyond simple pass/fail outcomes.
  • Reading asset condition trends over time, not only one-time test results.
  • Combining online and offline diagnostic evidence into one clear conclusion.
  • Identifying possible failure mechanisms from test data.
  • Building Health Index and Risk Index for MV/HV electrical assets.
  • Checking data quality, confidence, and reliability before making decisions.
  • Prioritising which asset needs action first, and why.
  • Preparing clear repair, replace, or monitor recommendations for management.
  • Applying the FM/HI/RI framework based on CIGRE TB 912 using real diagnostic case studies.

Outline

Day 1: From Test Results to the First Confident Decision
  • Real failure case challenge using actual diagnostic evidence
  • Why one test result is never enough
  • Introduction to the FM/HI/RI decision framework
  • Using IHMS to assess asset condition and risk
  • Hands-on Failure Mechanism flowchart exercise
  • Structuring diagnostic evidence for consistent decisions
  • Interpreting online diagnostic results, including PD and rotor flux
  • Understanding data quality, trends, confidence, and decision thresholds
  • Case Study 1: Network PD analysis for cables and switchgear
Day 2: Building the Complete Repair or Replace Decision
  • Interpreting offline diagnostic results
  • Cable offline assessment using VLF Tan Delta
  • Developing engineering recommendations from diagnostic evidence
  • Avoiding over-reaction and under-reaction in asset decisions
  • Failure Mechanism analysis and root cause correlation
  • Linking diagnostic signatures to physical degradation
  • Health Index and Risk Index evaluation based on CIGRE TB 912
  • Prioritising action across a fleet of assets
  • Case Study 3: FM/HI/RI analysis of 6 generators
  • Participant case review and clear recommendation for management
Participants will also receive post-course access to IHMS, including web and mobile access, participant-exclusive features, and one free engineer review.

Instructor

  • Principal Technical Authorities and an expert in Partial Discharge Testing.
  • Experience in Commissioning PD test assessment on HV Cables – Off-line / on-line test, PD test assessment on different assets – On-line/Off-line/ Laboratory test and Complete assessment on different assets – Off-line.
  • Performed over more than 200 commissioning, laboratory and PD test assessment: Off-line / On-line (Generators, Motors, HV/MV Cables, GIS Substation, HV Series Reactor, AIS/GIS Switchgears and Transformers (Oil Type / Dry Type- Cast Resin).
  • Provide PD Test Assessment on electrical Assets technical training.
  • Experience throughout Europe, USA, Asia, and the Middle East.
  • Travelled extensively, technical training and performed Partial Discharge testing in many countries worldwide. (Europe, USA, Asia, and the Middle East.)